close
close

Road work on I-15 in Hesperia-Victorville this week-pain in the passage

Road work on I-15 in Hesperia-Victorville this week-pain in the passage

Hasperia, California. (Pass pain) >> The California Department of Transport (Caltrans) will continue to work on a project of $ 122 million for rehabilitation and restoration of road lanes and ramp and upgrade drainage systems in Haspery to Victorville in the central divider/right shoulders of Interstate 15 in San Bernardino County. This project will not add an additional lane to the highway or for a high -speed train to Las Vegas.

By the end of January, the project was 96% completed and is still on the way.

Currently, crews are undergoing operations in the center of the middle, shoulder areas and at different and out of frames. The crews will continue the movement of K-RIL in the central divider to and the configuration lane changes back to the old road of I-15.

K-Ril will remain in place for the upcoming train to Las Vegas recently.

Hours of work: Monday night – Saturday morning.

North I-15 from Oak Hill RD to Bear Valley RD-21: 00 to 7am.**

• Alternation of the tape closure, possibly removing sails to one at times.

• *All on / off ramps are subject to periodic crew safety closure and related road work.

• The connector may be closed: NB/SB I-15 to NB/SB HWY 395 during operations. Watch for signs.

• NB Ranchero Road, Hwy 395 and Main Street Off Ramps can be closed:

Southbound I-15 From Bear Valley RD to Ranchero RD-19: 00. – 5 AM **.

• Alternation of the tape closure, possibly removing sails to one.

• *All on / off ramps are subject to periodic crew safety closure and related road work. Main Street and Joshua St. can be closed.

• The connector may be closed: NB/SB I-15 to NB/SB US 395 during operations. Watch for signs.

** Times can be changed and can go longer or start earlier. Within and off ramps may be closed. Please use caution and be sure to reduce your speed as you approach and drive through construction areas. Schedule are subject to change due to adverse time or construction problems.

The project is expected to be completed in the spring of 2025.

There are more ways to follow the pain in the passage. Join the traffic group of Facebook with over 155,000 members. Join the group of ScoutS Like us on the new page of FacebookS Follow us Newspaperand also follow us Instagram. Topics, and X Aka TwitterS

Leave a Reply

Your email address will not be published. Required fields are marked *