I-64 East Traffic and I-464 to the North, which will be displaced to the average of the I-64 East Exit 291A Rentchange Ramp, starting as early as February 3
Ctile -It starting at night as early as Monday, February 3, the crews of the contractors with the Ministry of Transport of Virginia (VDOT) are intended to apply long-term shifts of traffic at several nights on the I-64 East and I-464 to the north at the output 291A exchange of exchange ramp in Chesapik as part of I-64/I-464 project to improve the exchange ramp of exchange 291AS
East of the I-64, including the express lane, will be displaced left to the average between Boulevard Pole Boulevard (Exodus 292) and exchange of I-464 (Output 291A) and will continue along the ramp to I-464 to the north. Along with this displacement of traffic, traffic to the north along the I-464 will also be displaced to the middle of the I-64 west of the ramp and will end before the military highway (Exodus 2). These long -term straps are evaluated on the spot until the summer of 2026.
To complete the change of traffic and related work on the ramp, the ramp from I-64 to the east to the I-464 north (exit 291A) will be closed at night on 10-17 February, from 10:00 to 5 am, with a signed on -site circumvention.
Motorists are encouraged to follow all signs published in the active construction zone. The surrounding plates will be published and the electronic messages will show closing information. This construction work depends on time and graphics; Therefore, this schedule is subject to change.
Before you go on the road, consider using the free 511 Virginia Traffic Instures or the free 511-integrated Waze GPS app to check the most up-to-date road and travel conditions. Vdot Website 511Virginia.org and Mobile app Offer construction, traffic, incidents and congestion, as well as access to traffic cameras, time -related impacts, and more.
For more information on I-64/I-464 Renchanger Exit 291A Ramp Improvement Ram, visit the VDOT website of https://www.vdot.virginia.gov/projects/hampton-roads-distrget/i-64i-464-interhand-exit-291-Ramp-improvementsS
Last updated: January 31, 2025